yingjie@memoir
Skip to content

2026-05-16

  • In the morning, adjusted the table structure to make repos reference users.id as a foreign key
  • Added support for the --url parameter
  • Verified the pulled data
    • Discovered that PRs have no close time -> Filed an issue in the gitlink-cli repository

As of now, I feel that the infrastructure setup seems to have been successful. However, if a repository has a large amount of data, there might be two issues:

  1. The platform will limit request frequency
  2. Download time is too long A possible solution might be for the platform to provide an API endpoint that allows downloading archived and compressed data.

Task progress stages:

  1. Infrastructure
  2. Skill design and implementation

Skill design and implementation

For the open source project health report, first of all, this is a report, so there should be a report template.

  • Design report template
markdown
[Topic]
[Chapter]
markdown
# 开源项目健康度报告
## Issue处理时间
- 平均时间:x,中位数:x,最久:x,最快:x
- 最近一周关闭Issue:x
- 1天内:x,1周内:x,1个月内:x
## PR 合并率
- 合并率:x
- 总数:x,已合并:x,新建:x,已关闭:x
## 贡献者活跃度
- 最近一周新增PR:x
- 最近一周新增Issue:x,